Environmental
Water and Wastewater Management Project for High-rise and Low-rise Projects
20 November 2025
Construction Phase
- Temporary wastewater treatment systems are installed for water generated from construction processes and water used during construction.
- Water quality is monitored according to EIA requirements before discharge into public drainage systems.

Implementation Period
- All projects install standard-compliant wastewater treatment systems and hand them over to the condominium management for ongoing operation, ensuring water quality control before discharge into public drainage systems.
- Water samples are collected for quality testing monthly and reported to the relevant authorities.