Supply Chain Social & Environment: Collaboration with Contractors (FTSE: SSC12)
The Company has established operational guidelines for controlling and monitoring risks. In 2025, contractor audits were conducted operating in 60 projects, divided into 57 Low Rise projects and a number of High Rise Projects 3 projects. The Company continuously monitors social and environmental supply chain management in new and ongoing construction projects. This is linked to and sets indicators for ESG issues. The Company uses the audit results to jointly develop employees, contractors, and suppliers, and requires all contractors to pass the assessment criteria set by the Company.
In cases where a contractor does not meet the criteria, the Company requires immediate corrective actions on relevant issues, providing management advice, training, or improvement measures, along with continuously monitoring and evaluating supplier performance. continuously.
ESG-linked audit guidelines consist of 3 main parts:
- Environmental impact management and reduction plans, such as for dust, noise, wastewater, and waste management.
- Prevention and reduction of social impacts, such as traffic.
- Monitoring measures, such as pre-construction, during-construction, and post-construction checks.
- Contractor Scoring: The audit results will be used as criteria for evaluating contractors to encourage them to collaborate and operate according to the Company's standards.
| Score Level | Assessment Scoring Criteria |
|---|---|
| ≥ 90% or more = Excellent | Met criteria, 90% or more |
| 81 - 89% = Very Good | Met criteria, found only minor non-compliance issues. |
| 70 – 89% = Good | Met criteria, found moderate deficiencies. |
| 50 – 69% = Fair | Met criteria, found deficiencies that require collaboration with contractors to improve and develop issues that have not yet met the criteria. |
| ≤ 49% = Needs Improvement |
Did not meet criteria
|
- Continuous Improvement: Develop a Corrective Action Plan for identified deficiencies, set a timeframe for implementation, and support additional training on high-risk ESG issues such as occupational safety and health. If safety equipment is not available, immediately suspend work on the project, including human rights issues.
(FTSE: SSC12)
| ESG Assessment | Number of projects assessed | Contractors who passed the ESG assessment | ||
|---|---|---|---|---|
| Number (of entities) | Proportion (%) | |||
| High Rise Projects | 3 | 2 | 100 | |
| Low Rise Projects | 57 | 140 | 100 | |